Equipment Type

Putzmeister

Large shotcreting applications for tunnel construction can be handled with the self-propelled Tunnel-Kreter SP 40

October 01, 2002

Tunnel-Kreter SP 40Large shotcreting applications for tunnel construction can be handled with the self-propelled Tunnel-Kreter SP 40. The kinematics of its spraying arm and oscillating nozzle increase spraying speed. The 10-foot lance can be aligned parallel to the tunnel wall and it can be set to travel at variable speeds—automatically back and forth—so the operator can cover a 10-foot section of the tunnel by simply controlling the main boom.

More like this

Add comment

Plain text

  • No HTML tags allowed.
  • Web page addresses and e-mail addresses turn into links automatically.
  • Lines and paragraphs break automatically.
Image CAPTCHA
Enter the characters shown in the image.
Overlay Init