Equipment Type

Trimble VisionLink 2.4 Construction Software

Version 2.4 of Trimble VisionLink integrates site productivity data, fleet and asset management, and materials and volumes movement information using 2D Project Monitoring.

April 16, 2012

Version 2.4 of Trimble VisionLink integrates site productivity data, fleet and asset management, and materials and volumes movement information using 2D Project Monitoring. Project Monitoring allows managers to monitor cycle times, load counts, haul distances and cumulative volumes. During material movement operations, the machine’s position is continuously recorded and tracked to create distance and location, exact load and dump position, loading time, haul time, and dumping time. Machine data is sent wirelessly from the machine to the office and aggregated by VisionLink with machine utilization and performance, and compaction and volumes information to see near-real time progress on projects. 

GET FREE PRICE QUOTES

 
 

Site Positioning System Essentials Kit is designed for owner operators, small site contractors or construction companies new to GPS.

The Loadrite X2350 Payload Management System for excavators is a dynamic onboard weighing system to optimize bucket loads, track load out tonnage, and monitor cycle times.

Add comment

Plain text

  • No HTML tags allowed.
  • Web page addresses and e-mail addresses turn into links automatically.
  • Lines and paragraphs break automatically.

SUBSCRIBE TO OUR NEWSLETTERS

Optional
Optional
Type the characters you see in this picture. (verify using audio)
Type the characters you see in the picture above; if you can't read them, submit the form and a new image will be generated. Not case sensitive.

Featured Video