Equipment Type

 Bridge Finishers

products

Model 2418 workbridge provides a 24-inch wide walkway over its 18-inch deep truss frame, allowing wokers to cross freshly laid concrete surfaces.

Allen expanded its concrete pavers with the 4836B Bridge Deck Finisher that has a 36-inch-deep main frame.

GOMACO’s C-750 cylinder finisher, with the capability of finishing concrete up to 156 feet wide, has many of the same features as the company’s C-450 cylinder finisher

According to Terex Roadbuilding, the Bid-Well4800 automatic roller paver, featuring a newly designed truss system

Blogs

Big Iron
Out of the first 3,163 FAA exemptions for drones, 1,883 of them were for construction and infrastructure use.
Big Iron
Successful fleet integrations of telematics are few and far between, and the penetration rate remains low across the industry.
Big Iron
John Meese, CEM, is the 2016-17 chairman of AEMP, and he has set his sights on a more diverse association.
Big Iron
Unfortunate incidents shouldn’t be the only time to shine a light on safety.

CE Twitter Feed 

ConstructionEqt @ConstructionEqt
Hands-on, community involvement addresses the construction-labor issue. Don't wait for others to do it for you. ...
17 hours 3 min ago
ConstructionEqt @ConstructionEqt
Skid steers are popular machines, but telematics is an untouched tool. https://t.co/rwycT695YP...
1 day 14 hours ago
ConstructionEqt @ConstructionEqt
Popular machine, but telematics usage not so much. https://t.co/rwycT695YP...
2 days 18 hours ago

From the editors 

Rod Sutton @rodsutton
Only 12% use telematics, and here's how. https://t.co/3irSs8053m
2 days 18 hours ago
Frank Raczon @FrankRaczon
I always enjoy writing the @AEMP_ORG and...
1 week 2 days ago
Rod Sutton @rodsutton
Labor shortage? Participate in the community. https://t.co/1qbbAuwLiG
2 weeks 13 hours ago

Featured Video

Overlay Init